AISDP Assembly Timeline (Incremental, Phase 1 to Phase 5) The AISDP is assembled incrementally across the seven delivery phases. Module 1 is completed during Phase 1. Module 6 is drafted during Phase 2 and updated continuously. Modules 2, 3, 4 are populated during Phases 3–4 as architecture and development progress. Modules 5, 7, 8, 9 are completed during Phase 4 testing and Phase 5 validation. Module 10 is maintained continuously from Phase 3 onward. Module 11 is completed during Phase 2 and refined as the system matures. Module 12 is activated at Phase 7. By Phase 5, the AISDP should be substantially complete, requiring only final review and consistency checking. Key outputs

  • Per-module assembly phase mapping
  • Incremental assembly preventing retrospective documentation
  • Phase 5 completion target